• Site Map
  • Accessibility Links
  • English
Close

The Hon’ble Handloom and Textiles Minister opened the railway bridge – Tiruvallur District

Publish Date : 26/09/2024
The Hon'ble Handloom and Textiles Minister inaugurated the railway bridge

The Hon’ble Handloom and Textiles Minister inaugurated the railway bridge (part) constructed at a cost of Rs.78.31 crores instead of Pattabiram Crossing No-2, Avadi Taluk, Tiruvallur District. (PDF 43KB)

The Hon'ble Handloom and Textiles Minister inaugurated the railway bridge

The Hon'ble Handloom and Textiles Minister inaugurated the railway bridge

The Hon'ble Handloom and Textiles Minister inaugurated the railway bridge